No
Project Name
History
Application system
Client
Run Year
Remarks
1
CSU Hyd Part PLC HMI Program
Commissioning
PLC System
SMH
2017
 
2
CJ/Korea Express Gunsan Port Coal Pier BC & 2-Tripper
PLC Program,Commissioning
PLC, Inverter
Corin
2017
 
3
CJ/Korea Express Gunsan Port 1600T/H CSU
PLC Program,Commissioning
PLC, Inverter
SMH
2017
 
4
Taean Thermal Power 9,10 Lime Ston CSU Electric Work
Siweltel Equipment
STX
2017
 
5
Korean Shipbuilding(Haenam) 1500ton G/C Installation of Oiler)
Korean Shipbuilding
2017
 
6
Thailand, Siam Port RMQC /RTGC
DB, PLC Program,Commissioningˇˇ
Thyristor, PLC, Inverter
Corin
2017
 
7
Gwangyang Port CSU #10 Inverter Panel
DB, PLC Program,Commissioning
Inverter
ABB Korea
2016
 
8
Shin Boryeong CSU 2700T/H
Design/Trial Run
SMH
2016
 
9
Youngheung Power Plant 1 CSU Performance Improvements
DB, PLC Program,Commissioning
PLC System
Korea South-East Power
2016
 
10
Ssangyong Shipping CSU Equipment Check
Ssangyong Shipping